Where the transition stands
API published the third edition of Spec Q2 on September 10, 2026. The announcement itself gives no effective date, but API’s transition notice, issued the same day, does: all Q2-registered organizations must fully implement the third edition by October 1, 2027.
The notice is listed on API’s Monogram and APIQR updates page and sets the schedule below. One rule is already in force: since September 10, 2026, API has stopped accepting new applications and scope-change requests that contain ineligible scopes or exclusions. Questions go to API through api.org/ContactMonogram.
| Date | Milestone |
|---|---|
| September 10, 2026 | Third edition published; API stops accepting ineligible scopes and exclusions in new applications and scope changes |
| February 1, 2027 | Voluntary third edition audits can be requested; once an organization switches, every later audit uses the third edition |
| April 5, 2027 | New applicants must have implemented the third edition and are audited to it |
| Through September 30, 2027 | Organizations that have not requested the switch are audited to the second edition, and auditors raise a concern in each report about the missing transition |
| October 1, 2027 | All Q2-registered organizations must fully implement the third edition; failure may lead to suspension or cancellation |
| October 1, 2029 | Remaining second edition certificates are withdrawn; full implementation is already due by October 1, 2027 |
Step 1: Confirm your certificate scope
Check certificate eligibility first. The third edition focuses Q2 on organizations that perform well-site services in well construction, intervention, production, and abandonment.
API’s transition notice lists the standalone activities that no longer qualify as a Q2 certificate scope: calibration, engineering, design, training or technical consulting, NDE inspection, transportation, project management, software provision, manufacturing and/or product realization (including fabrication, welding, product testing and product inspection), and the supply or rental of service-related products without an accompanying service. Exclusions are removed, and all clauses of the specification must now be implemented.
Step 2: Run the gap assessment
Vendor and consultant summaries of the third edition identify the areas below as changed, and API’s announcement confirms the deferral provisions and PAC. For each one, decide what evidence your QMS already holds and what it lacks. The summaries do not reproduce the standard’s wording, so treat the rows as prompts and read the clauses themselves before writing procedures. API also lists a Q2 third edition conformity matrix among its Monogram and APIQR program documents.
| Area | What to verify |
|---|---|
| Service quality planning | Service execution and service-related product (SRP) requirements sit in one plan that covers applicable requirements, risks, responsibilities and verification activities |
| Performance acceptable criteria (PAC) | Acceptance requirements exist for each applicable SRP, and evidence shows they were met |
| Testing, measuring, monitoring and detection equipment | Controls cover owned equipment, equipment from other sources and the records; customers are notified when potentially nonconforming SRP has shipped or services were affected |
| Nonconforming service execution and SRP | Problems are identified, documented, contained, corrected and checked for effectiveness, for both service delivery and supporting products |
| Preventive maintenance, inspection and test program | Deferrals and concessions follow the conditions the standard defines |
| Knowledge and QMS planning | The knowledge needed to run processes and keep conformity is determined and documented, and planning considers internal and external issues and interested parties |
| Other changed areas | Competency and training, contract review, risk management, design, internal audits and management review |
Step 3: Test your records against a 10-year period
The third edition extends the required record-retention period to 10 years. API’s second edition audit report form (FM-198) lists a five-year minimum for records, and published analyses agree. Q1’s tenth edition made the same move from 5 to 10 years, which aligns the baseline minimums, subject to any longer customer, legal or other applicable requirement.
The analyses advise checking that document control, storage, archiving and retrieval keep records accessible for the full period. A practical test follows from that advice:
- List every record class the QMS produces, from service quality plans and PAC evidence to equipment calibration records and training records. Add the retention period that applies to each class, including any longer customer or legal requirement.
- For each class, name the system that holds it and the person who can retrieve it.
- Pull the oldest record you hold and confirm it opens, shows who approved it and which revision it belongs to.
- Check that records for people, equipment and suppliers remain linked to the jobs they supported.
Step 4: Rebuild supplier files around risk
The third edition shifts purchasing requirements toward a risk-based approach. Published analyses add detail: the line between purchased services and service-related products is drawn more precisely, and organizations keep approved supplier information, define what each supplier is authorized to provide, document approvals, and set reevaluation criteria based on risk and quality performance.
A November 2012 industry presentation hosted by BSEE lists supply chain controls for critical and non-critical services among Q2’s core controls. A supplier file that holds up under the third edition shows, for each supplier:
- What the supplier is approved to provide, and whether it is a service or a service-related product.
- The risk rating and the documented rule that sets how often the supplier is reevaluated.
- The approval record and the person who signed it.
- Quality performance since the last evaluation.
Step 5: Line up competency and training evidence
Published analyses list competency and training among the areas the third edition changed, and they recommend a gap analysis that covers it. The analyses do not set out the revised wording, so the text of the standard is the reference for what an auditor will test.
Training evidence for a service company is a set of records an auditor can trace from a procedure to a person. For each revised procedure or service quality plan, check that you can show the following. These four checks are practical suggestions for audit traceability, not requirements quoted from the standard:
- Who was assigned the training and on what basis, such as job title, crew or region.
- Who completed it, on what date and against which revision of the document.
- How competence was confirmed for work done in the field, such as a supervisor’s observation checklist measured against the competence criteria set for that role or task.
- What happened when a nonconformance traced back to a competency gap, and how the retraining was verified.
Q1’s tenth edition revised its competence requirements for personnel, so organizations certified to both specifications may reuse evidence where it satisfies both.
Step 6: Plan the transition audit
Transition requires a full system audit against the third edition, correction of any identified nonconformities with root cause analysis and corrective action, and an API certification decision. API says the process can take several months and encourages early transition, and voluntary third edition audits open on February 1, 2027. Plan backward from October 1, 2027. Run an internal audit against the third edition first, close what it finds, and confirm the revised controls work before the API auditor arrives.
Any nonconformance from the transition audit follows API’s standard response format. Each response needs four components: correction, root cause analysis, corrective action and evidence. Root cause analysis must go beyond rewording the finding and explain which QMS gaps led to it, and a repeat finding must explain why it recurred. API will not review an audit until it receives complete responses.
Where an integrated QMS and LMS fits
The Q2 transition produces revised procedures, and each one calls for an assessment of training needs. eLeaP’s Oil & Gas QMS keeps quality and training records linked in one platform, so the trail from a revised procedure to a trained person sits in one place.
- When a revised document becomes Effective, training can be requested automatically, and one click sends a document to training.
- Training statistics appear on each document, with a link to the full LMS report.
- Smart Assigning rules assign courses by job title, department or region.
- Observation checklists record in-person skill assessments, and skill levels support special process qualification.
- Nonconformance and CAPA workflows apply configurable templates, triage, recurrence detection and effectiveness checks, and CAPAs link to training records when a competency gap is found.
- A supplier policy matrix sets required files, audits, questionnaires and frequency by supplier type and risk level.
- A platform-wide audit trail records logins and actions.
Frequently asked questions
What should a Q2 certificate holder check first? The scope statement. Compare each line with the well-site eligibility language before starting any procedure rewrite.
Is there a grace period before the third edition applies? Partly. API’s transition notice says organizations that have not requested the switch are audited to the second edition through September 30, 2027, with auditors raising a concern in each report. All registered organizations must fully implement the third edition by October 1, 2027, or face suspension or cancellation.
What if the whole scope falls outside Q2? API withdraws the Q2 registration after the transition audit and encourages the organization to consider Q1. API waives the Q1 application fee upon request for applications submitted before October 1, 2027.
Who helped write the third edition? Technical experts from the United States, Canada, Brazil, Argentina, Malaysia, Saudi Arabia, and the United Arab Emirates, with BSEE representatives contributing.
How many companies hold Q2 certification? API reported in September 2026 that more than 250 companies worldwide hold it through the APIQR program, which has offered Q2 certification since 2013.